Interior Glass Partitions — Washington DC, MD & VA

Interior glass is a schedule and life-safety problem wearing a design costume. Egress, door swing, ADA clearances and acoustic performance decide whether the wall can be built as drawn.

We install demountable office fronts, frameless glass doors and acoustic glass walls, and we coordinate blocking, ceiling and life safety before the first panel goes up.

  • — Demountable systems that can be reconfigured instead of demolished
  • — Acoustic gasketing and door seals specified for the actual privacy requirement
  • — ADA-compliant hardware and clearances on every glass door
Commercial glass door installation

System selector

We install these published systems. Performance data below is the manufacturer's typical range, confirmed for your project before submittal.

Demountable systems

Single-glazed office frontsDouble-glazed acoustic frontsSliding glass doors

Tenant fit-outs that need to reconfigure without demolition.

Panels and frames can be relocated and reused when the floor plan changes.

Thermal

Interior, non-thermal

Request spec sheet

Published data, test reports and warranty terms for Interior Glass Partitions — Washington DC, MD & VA.

Shop drawings prepared for jurisdiction review Installed and serviced by the same crewsStart an RFQ

Technical specifications

Assembly values depend on the profile, glazing make-up and project wind load. These are the ranges we work within, with the governing test standard for each.

Code and test compliance

IBC 2021 Chapter 24
Safety glazing in interior locations and at doors.
ADA Standards Section 404
Door clear width, hardware and opening force.
NFPA 101
Means of egress through glazed partitions.
ASTM E90 / E413
Acoustic performance of the assembly.

The edition enforced on your project is confirmed with the authority having jurisdiction during permit review.

Interior Glass Partitions — Washington DC, MD & VA performance data
Performance metricTypical rangeTest standard
Acoustic ratingSTC 32 – 45 depending on assemblyASTM E90 / E413
Glass make-upTempered or laminated safety glazingIBC 2021 Chapter 24
Door clearance32 in minimum clear widthADA Standards 404.2.3
Hardware height34 – 48 in above finished floorADA Standards 404.2.7
Panel heightTo structural or ceiling grid, per systemManufacturer published limits
Fire ratingRated assemblies where required by the code pathNFPA 80 / ASTM E119

From bid to install

The same five steps on every project, whether it is one opening or a full facade.

  1. 01

    Site measure

    Openings, ceiling heights, blocking and floor conditions are surveyed against the architect’s layout.

  2. 02

    Shop drawings

    Elevations, door swing, hardware and acoustic details are submitted for architect and life safety review.

  3. 03

    Fabrication

    Frames and glass are fabricated to the approved dimensions, with doors prepped for the specified hardware.

  4. 04

    Installation

    Track, frames and glass go in with coordination to electrical and furniture trades, and doors are adjusted on site.

  5. 05

    Warranty and closeout

    Hardware adjustment, owner walkthrough and warranty documentation complete the package.

Frequently asked questions

Do interior glass partitions need a permit?

Usually yes when they create or change an enclosed space, because egress, door swing and life safety are affected. We coordinate the glazing submittal with the tenant fit-out permit.

How much privacy does an interior glass wall give?

It depends on the assembly, not the glass alone. Acoustic laminated glass with proper gasketing and sealed doors reaches a very different STC than a single pane with gaps around it. We specify to the privacy requirement you actually need.

Can a glass office front be reconfigured later?

With a demountable system, yes. Panels and frames are reused when the layout changes, which is the main reason tenants choose it over framed drywall.

Are frameless glass doors ADA compliant?

They can be, with the right hardware, clear width and opening force. ADA compliance is a hardware and geometry question, and we verify it before fabrication.

How long does an interior glass install take?

Days rather than weeks for a typical floor once blocking and dimensions are confirmed, because there is no drywall finishing or painting sequence.

Request the specification package

System data, test reports and warranty terms, plus a takeoff against your drawings. Tell us the scope and the jurisdiction and we will respond with what the review will require.