24/7 Emergency Service
Service area

Commercial Glazing Contractor — Arlington, VA

Arlington is a vertical market: towers in Rosslyn and Ballston, the National Landing build-out, and older garden-style commercial properties that need repair rather than replacement.

Permits run through Permit Arlington under the Virginia Uniform Statewide Building Code, and curtain wall work on the larger sites comes with mock-up and field testing obligations that we carry from submittal through closeout.

Permits in Arlington

Arlington County CPHD — Permit Arlington · Permit Arlington online portal

  • Glazing and storefront permits are filed electronically through Permit Arlington under the Virginia USBC.
  • Envelope changes require energy code documentation and, where the scope affects structure, sealed calculations.
  • Projects in historic districts or on designated landmarks require review by the Historical Affairs and Landmark Review Board before permit issuance.
  • Right-of-way occupancy for cranes, lifts and staging is approved separately from the building permit.

Code editions we build to

Virginia Uniform Statewide Building Code (USBC)
Statewide code enforced by Arlington County.
IBC Chapter 24
Glass and glazing provisions adopted through the USBC.
IECC 2021 (Virginia edition)
Envelope thermal requirements.
AAMA 501.1 and 501.2
Dynamic and field water penetration testing.

Areas covered

  • Rosslyn
  • Ballston and Virginia Square
  • Clarendon and Courthouse
  • National Landing and Crystal City
  • Pentagon City
  • Shirlington
  • Columbia Pike
  • Cherrydale and Lyon Village

Commercial services in Arlington

Commercial properties only: retail centers, office buildings, medical suites, warehouses, multi-tenant buildings and general contractor projects. We do not take residential work.

Arlington glazing questions

Can you handle unitized curtain wall as a sub-tier package in Arlington?

Yes. We have delivered unitized curtain wall scope as a glazing sub-tier on National Landing area work, including mock-up coordination, embed tolerance review and daily production tracking against the base building schedule.

How does Permit Arlington affect my schedule?

Electronic submittal is faster than paper, but review comments still take time. We submit complete packages with product data and calculations on the first pass so the permit is not cycled for missing information.

Do you replace storefront glass in occupied Arlington office buildings?

Yes, including night and weekend installs with temporary protection so tenants keep a working entrance and a weather-tight envelope.

What is the lead time on a curtain wall replacement panel?

It depends on whether the profile is still manufactured and whether the glass make-up is standard. We identify the existing system first, then give you a realistic lead time rather than an optimistic one.

Request a quote in Arlington

Send the scope, the address and any drawings. You get a written response from an estimator, not a call center.