Curtain Wall
Walgreens — Curtain Wall System

Curtain wall glass panel replacement at the ground floor of a Walgreens-occupied building, with the opening above the work area boarded.
Scope delivered
- Three-person crew setting a full-height glass panel into the ground-floor curtain wall bay.
- Plywood protection over the opening above the work area while the panel was out.
- Scissor lift and van staged at the base of the building.
- Storefront kept secure through the panel change.

