24/7 Emergency Service
Storefront

Hair Cuttery — Emergency Storefront Board-Up

Night emergency board-up of a Hair Cuttery storefront entrance with plywood and a ladder

Night emergency board-up at a Hair Cuttery after the entrance glass was damaged, with the doorway secured in plywood.

Scope delivered

  • Plywood board-up across the damaged entrance and door frame.
  • Work completed after dark to secure the storefront the same night.
  • Ladder and temporary lighting used inside the entrance.
  • Neighboring tenant signage left undisturbed.
Request a quote for a similar scope